Under construction…
 
 
 - RF injection trials in the RFQ cavity carried out for the first time from the Central Control Room 
 
 - Screenshot of the injector oscilloscope during this week operation with 6mm-PE 
 - Test preparations in front of RF-RFQ modules in RF area 
 - Realignment of the SOL2 magnet of the LEBT 
 
 
 - Laser trackers in position during the alignment survey in the vault. 
 
 - Photo 2: Data transfer test at F4E Garching 
 - Photo 1: Data transfer test at Central Control Room in Rokkasho 
 - Preparation for injector scroll pumps testing (using a new workbench installed in front of the injector to ease maintenance operation). 
 
 - Top view of the last section of the HEBT: from bottom to top, the doublet magnet, the dipole and the second triplet. 
 
 - Extended view of the MEL with the new vacuum chamber for the RGBLM 
 
				 
				 
				