Skip to content
IFMIF/EVEDA

IFMIF/EVEDA

to test future fusion materials

  • HOME
  • Broader Approach
    • JT-60SA
    • IFERC
    • IFMIF/EVEDA
  • IFMIF Project
    • What is IFMIF
    • Why IFMIF
    • IFMIF Engineering Design Activities
    • IFMIF around the world
  • IFMIF/EVEDA phase
    • Accelerator facility: LIPAc
      • Injector+LEBT
      • RFQ
      • MEBT
      • SRF Linac
      • HEBT
      • Beam Instrumentation
      • RF Power System
      • The Building
    • Target Facility
    • Test Facility
      • High Flux Test Module
      • Medium Flux Test Module
      • Small Specimen Test & Fission Chamber
  • IFMIF users & publications
    • Newsline
    • Publications
    • Rokkasho site Access
    • DMS access
    • Copyright

IFMIF/EVEDA PC#27


Event Details

  • Date: 19 March 2021
  • Venue: IFERC Site
  • Categories: Meetings

Latest News

  • March 12th: 40 mA H+ beam @ 10 % DC
  • March 11th: RF injection at nominal cavity voltage @ 100 Hz, 4% DC (Pulse Mode)
  • March 8th: Proton extraction resumed
  • March 2nd: End of installation of 6 mm Plasma Electrode and chopper at injector
  • February 26th: RF injection at nominal cavity voltage @ 100 Hz, 1.5% DC (Pulse Mode)
  • February 24th: Decision made for the realignment of the second LEBT solenoid to the RFQ

IFMIF/EVEDA Events

  • BASC#27 on 21 April 2021
  • BASC#27 on 22 April 2021

Recent Posts

  • Weekly LIPAc highlights (22/Marh-26/March) 31 March 2021
  • Weekly LIPAc highlights (15/March-19/March) 19 March 2021
  • Weekly LIPAc highlights (8/March-12/March) 15 March 2021
  • Weekly LIPAc highlights (1/March-5/March) 8 March 2021
  • Weekly LIPAc highlights (22/Febuary-26/February) 26 February 2021

Information

  • Glossary
  • Contact
  • Privacy policy
  • Copyright

Related projects

  • Broader Approach
  • JT-60SA
  • IFERC

News

  • IFMIF/EVEDA Newsletters
  • Latest News
Proudly powered by WordPress Theme: Colinear by Automattic.